top of page

Monte Redondo Race Resort

Client

Epinephrine Capital

Year

2024

Location

Coimbra, Portugal

Share

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

Project Website:

SOLAPAVE and Epinephrine are creating a European hub for Electric Vehicle development and enjoyment, consisting of not one, but 2 race tracks; a 5.6Km gp circuit and a 2.5Km Solapave track, focused on EV innovation.  

​

This development will be at the forefront of new EV design philosophies, helping in reducing battery size and increasing electric vehicle capability alongside OEM vehicle manufacturers.

Performance Testing

​

22KW/hr Dynamic Recharge

 

Vehicle Development

 

Autonomous Systems 

Energy Generated /day:

​

17,500+KWhrs

​

Lifetime Carbon saving:

 

89M Tonnes 

87.png
bottom of page